General information

IMO:
8607309
MMSI:
Callsign:
UCUC
Width:
17.0 m
Length:
136.0 m
Deadweight:
Gross tonnage:
TEU:
Liquid Capacity:
Year of build:
Class:
AIS type:
Fishing Boat
Ship type:
Flag:
Russia
Builder:
Owner:
Operator:
Insurer:

Course/Position

Position:
Navigational status:
Undefined
Course:
203.5° / -128.0
Heading:
511.0° / -128.0
Speed:
Max speed:
Status:
moored
Location:
Las Palmas (Reina Sofia Suroeste)
Area:
Last seen:
2015-04-10
3545 days ago
Source:
T-AIS
Destination:
ETA:
Summer draft:
Current draft:
Last update:
3545 days ago
Source:
T-AIS
Calculated ETA:

Not visible with your account? Upgrade here...

Upgrade

Latest ports

Port
Arrival
Departure
Duration
2015-03-03
2015-04-10
38d 21h 12m
2014-10-13
2014-10-16
2d 5h 36m
2014-06-16
2014-06-17
1d 9h 6m
2014-05-07
2014-05-15
8d 54m
2014-05-02
3888d 16h 54m
2013-10-14
2013-10-14
5h 41m
2013-10-07
2013-10-07
8m
2013-07-19
2013-07-20
1d 3h 19m
2013-07-18
2013-07-19
1d 2h 55m
2013-07-13
2013-07-13
Note: All times are in UTC

Latest Waypoints

Waypoints
Time
Direction
-
-
-

Latest news

Debunkering of trawler wreck completed

Mon Nov 30 11:37:02 CET 2015 Timsen

Salvamento Marítimo has completed debunkering of the "Oleg Naydenov" by end of November and had all leaks sealed 15 miles off of Punta Maspalomas. The wreck held an estimated 1,409 tonnes of fuel. Ardent, the company which was awarded the debunkering contract removed oil from the vessel in coordination with La Sociedad de Salvamento y Seguridad Marítima (SASEMAR). The salvage team used remote operated vessels in addition to heavy lifting equipment from the surface. In order to stem any further environmental pollution, subsea recovery domes have been installed over leaks which had been located during inspection. 528 m3 of oil waste have been collected during the clean up process. The technical committee overseeing the process has ended the wreck's emergency status, handing over underwater and aerial monitoring activities to the Coastguard. Report with photo: http://shipandbunker.com/news/emea/922531-debunkering-of-sunken-bunker-spill-trawler-oleg-naydenov-complete

sunk

Wed Aug 19 21:49:56 CEST 2015 BerndU

sunk after Fire 11.04.15 27 32N,0 15 30 W

Preparations for fuel siphoning completed

Tue Jul 28 10:10:59 CEST 2015 Timsen

The Norwegian company ORYX announced that the siphons to pump the remaining diesel fuel from the "Oleg Naydenov" could be fixed at the wreck in a water depth of 2700 meters off Gran Canaria. The remaining fuel was to be pumped out until Nov 14.

Upload News

Daily average speed

Not visible with your account? Upgrade here...

Upgrade

Distance travelled

Not visible with your account? Upgrade here...

Upgrade

Ship master data